One-page pilot brief
Choose Save as PDF in your browser’s print dialog. A4 portrait, with margins, works best.
Circular Appliance Co. · Pilot brief
A 50-unit supply trial, before anything else.
The intended operating model is to intercept those machines, restore them under trade supervision, test every one to AS/NZS 3760, and sell them at two published prices: a concession price that recovers cost, and a retail price whose margin pays for it. The repair bench is planned to double as a supervised training floor. The enterprise is pre-launch — building the workshop and seeking a 50-unit supply trial — and no machine has been processed yet.
Version 1.0 — July 2026 business framework; content reviewed November 2026
01 · The ask
A trial agreement to release 50 repairable units from a transfer station or retailer collection stream
- Execute a 30-day trial agreement with one council transfer station or one retailer
- Process a 50-unit batch end to end: triage, repair, test, tag, quality control
- Record actual labour hours, parts spend and repair conversion rate per unit
- Replace every modelled figure in the financial model with observed data
The cross-subsidy is the whole model, so it is published rather than hidden. What we are seeking now is not primarily money — it is a supply agreement that releases 50 repairable units, so that every modelled figure on this site can be replaced with an observed one.
02 · What exists today — design, not operations
- Software safety gate
- A unit cannot be released for sale or published to the shop without a passed AS/NZS 3760 test signed off by a named supervisor holding a recorded licence number. This is a rule in the software, not a line in a procedure manual — the transition is refused and the publish control stays disabled. No unit has passed through the gate yet. The intended warranty, the product-liability position and every referral relationship rest on it.
- Serial traceability
- The system assigns a serial at intake and is designed to keep the triage decision, repair history, test record, sale and any warranty claim against that serial for life. It is what will make the repair conversion rate a measured number rather than an estimate, and it is what a funder auditing an impact claim will want to see.
- Indicator definitions
- 12 indicators have a published definition, source and reporting frequency. Every running total is currently zero because there are no operating records. Every indicator on this site is computed from the records the workshop will have to keep anyway — intake weights, triage outcomes, test results, sale tiers, training hours. Nothing depends on a separate reporting exercise that quietly stops happening in month four, and closed periods are frozen so published figures never move retrospectively. With no operating records yet, every figure currently reads zero.
- Pricing model
- 5 intended streams are published, from Tier 1 concession through retail and commercial to collection and salvage. The intended warranty is six months on every unit, subject to legal review. Every figure is a planning assumption, not a quote.
03 · What is still unproven
- The financial figures are not yet evidence. Direct cost per unit, tier pricing and contribution are planning assumptions, not observations. The largest and least certain input is workshop labour per unit, which depends on hours per machine and on wage subsidy. The 50-unit pilot exists specifically to replace these numbers, and the operating system is built to capture exactly the figures that replace them.
- The entity is not yet incorporated. Legal structure is being settled with an adviser, because the choice determines tax treatment, DGR eligibility and grant access, and is hard to unwind. Grant applications in the first round go through an auspice partner regardless, since two years of audited financial statements are a mandatory attachment no new entity can produce.
- Regulatory obligations are not yet confirmed. Requirements for selling second-hand electrical appliances vary by state and change over time, and the treatment of rental and deferred-payment offers may engage credit regulation. These must be confirmed with the electrical safety regulator, the consumer affairs body and a lawyer before the first unit is sold. Nothing here is a compliance opinion.
- Supply volume is the binding constraint, not demand. We intend to test demand with case managers during the pilot; no referral agreement is in place yet. What is unproven is whether enough repairable units can be released before compaction, at a predictable rate, to schedule a workshop around. That is why the supply agreement is the first ask and everything else is sequenced behind it.
There is no operating workshop, no signed supply agreement, no housing contract, no named training provider, no insurance cover bound and no machine collected or sold. Impact figures are zero, not estimates.
04 · The three partner asks
01
Supply
A trial agreement to release 50 repairable units from a transfer station or retailer collection stream
02
Demand
An expression of interest from a community housing provider for tenant fit-out supply
03
Capability
A pathway conversation with an RTO and an employment services provider
05 · Indicative figures and legal position
All pricing, cost and margin figures shown are indicative planning assumptions developed for modelling purposes. They are to be validated and replaced with observed data during the 50-unit supply pilot before being used in any binding commercial or grant commitment.
Requirements for selling second-hand electrical appliances — testing standards, tagging, record-keeping, licensing, and the treatment of rental or deferred-payment offers — vary by state and territory and change over time. The applicable obligations for the operating jurisdiction must be confirmed with the relevant electrical safety regulator, consumer affairs body and a qualified lawyer before the first unit is sold. This site identifies risk areas; it is not legal advice and is not a compliance opinion.
06 · Contact route
Start with a conversation, not a commitment. Mark Della Casa Alberighi handles supply, partnership and funding conversations; Hayden Della Casa Alberighi leads the workshop design and the training pathway.